This equipment quality structural for kinds of site, like hospital, environmental department, animal cremation agencies, etc. […]
Burring Ability 100/ 200 KG/ human resources Please develop your deal right here Variety of Heater […]
HICLOVER brand is holder of Nanjing Clover Medical Technology Co.,Ltd. we are incinerator manufacturer in china […]
1 Incinerator 30 =KG burn/h and it must have a Scrubber. 2 Incinerator must have Electrical […]
Incinerator Version CA100, Overview 100Kg/Hour Burning rate with Secondary burning Capacity This design is small medical waste […]
Coronavirus Disease 2019 (COVID-19) pandemic continues all over the world, clinics,hospitals,goverment may need to consider on-site […]
the following containerized incinerators. (Kitchen and accommodation and grey water and black water plant removing waste) […]
Lately among customers informed us their goal to procure 1 system Gas Incinerator.medical waste burner to […]
Design CA-200 Image Burning Rate Ordinary 100 kgs/hour Key Burning Chamber 2000 Liters Additional Burning Smokeshaft […]
*** Primary combustion chamber & secondary combustion chamber *** Smoke filter chamber(dry scrubber) *** stainless steel […]
inciner8ter model TS50 OR TS100 With delevery in Europe stare Croatia.Please can you send me the […]
INCINERATEUR DE DECHETS HOSPITALIER hospital incinerator layout SPECIFICATIONS TECHNIQUES. Capacité damaging de 55 Kg/h jour de […]
The incinerator plant shall incorporate a control panel for its operation. On the control panel we […]
Capacity Not less than 500Kg/hr.Operation 24hr-7days/week continuous operation.Combustion chamber 2 combustion chamber.Temp. First combustion chamber 800-1000 C. Secandry combustion chamber 1000-1200 C, with the possibility to be upgraded to 1400 C.Combustion Efficiency 99.99%Retention time Of the flow gases not less than 2 Sec in the hot portion.Excess Oxygen concentration Of primary combustion chamber 3-6% max. Refractory The chambers should be lined with high thermal insulating refractory bricks with suitable thickness and with highly temp. resistance. Not less than 1400 C for the first combustion chamber, and not less than 1600 C for the secandry combustion chamber, and at the same time prevent the Temp. of the outside body of the chamber not higher than 70 C.Doors Should be lined with the same bricks, and the edges lined with special suitable insulating material to prevent any gas escaping, and the doors should be kept under negative pressure during the operation.Air Emission Control System With high destruction and removal efficiency (DRE). Not less than 99.9999 as per KEPA.Wet System If the system equiped with a CEMS washing the flow gas with water, then it should be manufactured from suitable anti corrossion materials, and equiped with pH meter to measure and neutralize the water. It should be able to use the water in closed recycled circuit many times before treating/ discharging into the sewage system in compliance with KEPARS.Chemical dosing It should be equiped with suitable autochemical dosing system to control the pH for the water of the wet scrubber system including sensors.Chimney It should be suitable with the capacity and the technical specifications, with height not less than 12m from ground level. With easy opennable sampling point equal about 3 inch, and the optimum sampling locations is at least 8D downstream direction and 2D upstream from any flow disturbancies.Sampling point […]
ISO Container Incinerator: Streamlining Waste Management with Standard Shipping Containers When it comes to managing waste […]