In the realm of agriculture, managing waste effectively is not just about maintaining cleanliness but also […]
Polaris Energy saving News: With the extensive use of the health care industry and the development […]
waste burner manufacturer china, Waste chamber Chamber capability 300 kg Chamber quantity.54 m3. Chamber dimension (exterior) […]
Incinerator 20 Kg Incinerator electrically operated including: A cage for receipt of biomedical waste; […]
Items/Model TS50M Picture Burn Rate Average 50 kg/hour Feed Capacity Average 50-150 per feeding Control […]
Basic Info. Model NO.:waste incinerators equipment manufacturers Export Markets:Global Product Description Key Features: * All models […]
Basic Info. Model NO.:small medical waste incinerator manufacturers Export Markets:Global Product Description Technology Respond(FAQ) Q: What […]
Waste calorific value : 4000KCAL/KG Moisture Content : 10-25% Nominal Capacity : 50Kg/Hour batch load Secondary […]
Stack: Kind: Cord Supported MOC: Mild Steel of ISstd – 5 (5) YEAR PART SERVICE WARRANTY […]
Transportable Incinerator System: Your Flexible, On-Site Waste Treatment Solution In today’s fast\paced world, effective waste management […]
Basic Info. Pullution Sources:Solid Waste Processing Processing Methods:Combustion Export Markets:Global Additional Info. Trademark:clover Product Description Principle […]
This model is small-scale waste incineration equipment for small waste output. Construction is dual/double combustion chamber […]
We have a 70 bed hospital in namibia. however there is a potential of getting customers […]
* medical incinerators, The insulation of the combustion chamber should be composed of refractory bricks, having […]
hot medical waste disposing machine, Operation Condition: 8-16 hr/ day Control: Built-in data recordingOperating temperature: Incinerator /Primary Combustion ChamberPrimary Chamber: 900 – 1200 0C Type: continuous loading, Top LoadingCapacity/Burn rate per hour: 250 -300 kg/hr Material:External- 3 layers Internal lining: a fire proof material of pre-fired refractory bricks with Aluminium lining, resistant to corrosive waste or gas and to thermal shockSecondary Combustion Chamber:Type: horizontal/verticalTemperature: 1200- 1300 oCResidence time of gases : >2 secondsAsh Residue: <5% of original waste sizeAsh Handling System: Both Automatic and manual removal of Ash. Must ensure removal/treatment of hazardous remnants of ashFlue gas treatment system : Capable of treating the flow of flue gas as the incinerator is operating at its maximum capacityAuxiliary device: Water level gauge, pressure sensor, PH sensor..etc Auxiliary device: Fuel cut-off deviceWaste feeding mechanism: Automatic pneumatic/hydraulic waste loading system or conveyor belt , capacity 650-800 L at a time Chimney (Stack):Type: Vertical typeheight:>7 meter’Material: Fireproof cast, stainless steelOUTPUT: GAS- SMOKELESS,ODORLESS ASH -Max <5% of original waste sizeReduction of Pollutant gas SO2, HCL, HF and line particulateEmission standard:WHO/ EuropeanTest report for emission testing provided?Heat exchange mode: Automatic Accessories: All standard accessories for incinerator, including but not limited to loading system, heat exchangers, pollution control system, ash removal system, including ladder and oil tanker (2500litre capacity).Operating Environment: The incinerator is capable to operate at the altitude of 2400mt above sea level. (according to the site conditions)Power Requirement:220 Vac single phase or 380 Vac three phase 4 wire system 50HZ Installation Testing and Commissioning : to be conducted by certified or qualified personnel. Supplier shall provide the following documentation User (Operating) manual in English. Service (Technical / Maintenance) manual in English. Certificate of calibration and inspection from factory. Fast moving spare parts: Supplier is able to provide fast moving spare parts with quantities as described in the price schedule or their equivalent. Training: Supplier is able to provide training on operation, management and maintenance of incinerators. Warranty Comprehensive warranty for minimum 2 year. Maintenance Service during Warranty Period During warranty period supplier must ensure, corrective/breakdown maintenance whenever required. Supplier has a local agent or branch office in Ethiopia (please indicate the name and contact details of the agent) Supplier provides labor, lifting equipment and tools needed for the installation, testing and commissioning of the incinerator. The supplier will be responsible for the safety of its staff, workers and laborers during the installation, testing & commisssioning Able to provides all necessary information that would be used as an input for preparation of floor (platform) and room for the incinerator to be supplied such as the following; Lay outs (drawings) and pictures of the incinerators to be installed Length, width and height of incinerator, Area (length x width) for the floor (platform) and Length, width and height for roofing, for each type of incinerators to be installed Needs during the transport, installation, assembly, commissioning and operation of the equipment in terms of access points, available space to operate (inside and outside of the room), ways to get to the site where the equipment will be placed or any others. ; Technical Specifications (fuel consumption rate, weight, anchoring system, support points, etc.); Chimney specifications to be used for the roof design ( size, support needs, insulation); Considerations related to operation and Maintenance, for e.g., minimum available area to perform routine maintenance tasks and replacement of key parts that need to be changed more frequently; Any consideration/need of the incinerator while being operated that might impact the design of the room/shelter where it will be placed.Other important information to be considered that can influence or impact the designing and building processes of the infrastructure for the incinerators, for example area dimension for other accessary parts like fuel tanker storage, if applicable, etc…. Delivery time (DAP, Addis Ababa) in weeksName of manufacturer including website of the manufacturer &/ supplier & country of origin
medical waste incinerator iraq price HICLOVER TS10 PLC 10kgs per hour Items/Model TS10( PLC) Image Melt Price […]